The existing runway of our Kayseri Airport, which was commissioned on November 15, 1998, was built as an asphalt paved runway in dimensions of 2500x45 m, then was converted to concrete covering with extensive renovations in 2000 and its length was increased to 3000 meters. CAT-I category 07/25 runway 3000x45 m with landing and Takeoff infrastructure of Class D aircraft located at our airport. it is in size and the parallel taxiway is 3400x22. 5 m. they are in size. There is 1 ILS system installed in the direction of 25 runways.
12, located on an area of 5,820,000 m2. DHMI Kayseri Airport Directorate has two terminal buildings, domestic and international lines, which are allocated within the borders of Air Transport Main Base Command and operate on an area of 100,000 m2. Although the total area of use of Terminal buildings is 22,000 m2, there are 9 aprons with aircraft parking capacity.